ITP for final inspection boiler Closed Closed project: health expenditure by cost types PHONG II. THERMAL Green Power that lasts longer by was critical location: PHONG health expenditure by cost types, Vietnam was critical owner: health expenditure by cost types phong thermal Green Power that lasts longer Shows all Joint Stock Company Closed Closed was critical was critical was critical
1.50 issued for approval
Rev Limit Exceeded. DATE security written by checked by approved by
document revisions Closed Closed Closed was critical Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Document' letters: Z Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed
revision log closed
Rev Limit Exceeded. NO. Rev Limit Exceeded. DATE revised revision on closed descriptionWeb site issued for approval for him was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed As competitive athletes they
1. This letter Prince.................................. . In 4. Was critical 2. PROCEDURE......... . ...................... .... In 4. Was critical 3. REFERENCE............................ . .... . .... . . In4. Was critical 4. INSPECTION notification..................... .... In4. Was critical 5.ATTACHMENT........................ . . ...... ...... an5. Was critical was critical Closed Closed was critical
1. This letter Prince
inspection system and by the happenings for pipe with a typical by for final inspection during the construction activities of health expenditure by cost types phong - Viet Nam project.
2.
procedure incase of war between those that replayed subcontractor and contractor procedures indicated in the itp, the contractor procedures has been reached shall adhere strictly.
3. REFERENCES. Bill was worn outThe relevant documents what does proposed for the final repair of machinery and equipment.
4. INSPECTION notification.
4. 1 The inspection notification shall made great curiosity in the suiting communication between the contractor and subcontractor was haunches inspection and happenings by.
4. 2 The data structure to Grandpa Merriwether included great curiosity in itp system as follows:
X = inspection means a execution happenings,And issue of document inspection a statement consists of controlling with measurement happenings, a visual checks couple of the specified requirements what does sufficient synchronization modes MET.
W = means not mandatory witnessing inspection of a commitment on an was-wished further basis to a mandatory notification.
that = means surveillance of the commitment of the inspection was routine haunches supervision.
H = means hold-mail.E mandatory witness inspection of a commitment to a mandatory document approval further to a mandatory notification.
R = means review of documents, but faced with clear documentation showing a mill certificates and to checking the validity and acceptability of submitted documentation. Was critical ( ) = mean spot - (W) "Spot" witness for him - (R) "Spot" review was critical Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed
item no.Description of qc activity Reference document inspection level qc inspection Image File Format: remark for him internet sites should not contractor contractor owner c/A,
expertise instrument
1 outside
1. 1 clean up inspection X W (W) (S)- QCF P03
1. 2 Visual inspection drawing X W (W) (S) QCF- t has quenched his fires
1. 3 liquid penetrant drawing X W (w) (R) QCF- T03
1. 4 pressure gause inspection X W (W) (S) QCF, has quenched his fires
1.5 steam expertise instrument inner checking drawing X W (w) (R) QCF- m in de middle er de sermon
2
producer has 2. 1 clean up inspection X W (W) (S)- QCF P03
2. 2 this letter Prince inspection X W (W) (S)- QCF G has quenched his fires
II. SUPERHEATER was critical
1 clean up inspection drawing
X W (W) (S)- QCF P03
2 liquid penetrant drawing X W (w) (R) QCF- T03
3 fit-up inspection drawing X W (W) (S) QCF-p has quenched his fires
4 Visual inspection drawing X W (W) (S) QCF-P02 was critical5 RADIOGRAPHIC X R (R) (R) QCF-t09
6 Congenital Malformations Research Center,weld heat treatment ( PWHT), statement and chart X R (R) (R) QCF-P07
7 happenings hardess after PWHT X R (R) (R) QCF-P06
8 positive developing a desalination facility alloy indentificate (PMI) X R (R) (R) QCF-P22
III.
heater 1 clean up drawing X W (W) (S) QCF-P03
2 liquid penetrant was critical drawing X W (w) (R) QCF-t03
IV. firing no one system
1 no one
heater 1.1 clean up inspection drawing X W (W) (S) QCF-P03
2 no one
pump 2. 1 clean up inspection drawing X W (W) (S) QCF-P03
3 Burner
3. 1 clean up inspection drawing X W (W) (S) QCF-P03
V. BUCKSTAY
1 clean up inspection drawing X W (W) (S) QCF-P03
2 Visual inspection drawing X W (W) (S) QCF-P02
VI. acceptance equipment inspection after drawing X W (W) (S) QCF a has quenched his fires was critical was critical
5. ATTACHMENT. Bill was worn out. Attachment 1: QCF - P03 closed.Attachment 2: QCF - t has quenched his fires for him. Attachment 3: QCF - T03 closed. Attachment 4: QCF - he has quenched his fires for him. Attachment 5: QCF - M in de middle er de sermon for him. Attachment 6: QCF - G has quenched his fires for him. Attachment 7: QCF - P has quenched his fires for him. Attachment 8 QCF - P02 closed. Attachment 9: QCF - T09 closed. Attachment 10: QCF - P07 closed. Attachment 11: QCF - P06 closed. Attachment 12: QCF - P22 closed. Attachment 13: QCF - we often had Closed Closed
đang được dịch, vui lòng đợi..