ITP FOR FINAL INSPECTION BOILER PROJECT : HAI PHONG II THERMAL POWER P dịch - ITP FOR FINAL INSPECTION BOILER PROJECT : HAI PHONG II THERMAL POWER P Anh làm thế nào để nói

ITP FOR FINAL INSPECTION BOILER PRO

ITP FOR FINAL INSPECTION BOILER

PROJECT : HAI PHONG II THERMAL POWER PLAN
LOCATION : HAI PHONG, VIETNAM
OWNER : HAI PHONG THERMAL POWER JOINT STOCK COMPANY





00 Issued for Approval
REV. DATE STATUS WRITTEN BY CHECKED BY APPROVED BY
DOCUMENT REVISIONS













Document Class: Z


















REVISION LOG

REV. NO. REV. DATE REVISED PAGE REVISION DESCRIPTION
00 ISSUED FOR APPROVAL







































CONTENT
1. GENERAL…………………………………………………………..PAGE 4.
2. PROCEDURE ……………..…………………………………….….PAGE 4.
3. REFERENCE………………………………………………..…..…...PAGE4.
4. INSPECTION NOTIFICATION………………………………….….PAGE4.
5. ATTACHMENT………………………………………...……….……PAGE5.





1. GENERAL
This Inspection and Test Plan for pipe is a typical plan for final inspection during the construction activities of Hai Phong - Viet Nam Project.
2. PROCEDURE
Incase of any conflict between Subcontractor and Contractor procedures indicated in the ITP, the Contractor procedures shall be strictly adhere.
3. REFERENCES.
The relevant documents are proposed for the repair final of machinery and equipment.
4. INSPECTION NOTIFICATION.
4.1 The inspection notification shall be made in the daily communication between the Contractor and Subcontractor as per Inspection and Test Plan.
4.2 The interface points to be included in this ITP as follows :
X = Means inspection or test execution, and issue of document or inspection report consists of controlling with measurement, test or visual checks that the specified requirements are sufficient met.
W = Means not mandatory witnessing of inspection or work on an as-wished basis further to a mandatory notification.
S = Means surveillance of Work of Inspection as per routine supervision.
H = Means Hold Point i.e mandatory witness of inspection or work or mandatory document approval further to a mandatory notification.
R = Means review of documents, reports or mill certificates and to checking the validity and acceptability of submitted documentation.
( ) = Mean spot - (W) “Spot Witness”
- (R) “ Spot Review”












ITEM No. Description of QC Activity Reference Document Inspection Level QC Inspection Format Remark
Sub-contractor Contractor Owner C/A
I DRUM
1 OUTSIDE
1.1 Clean inspection X W (W) (S) QCF- P03
1.2 Visual inspection Drawing X W (W) (S) QCF- T01
1.3 Liquid Penetrant Drawing X W (w) (R) QCF- T03
1.4 Pressure gause inspection X W (W) (S) QCF- I01
1.5 Steam drum inner checking Drawing X W (w) (R) QCF- M05
2 INSIDE
2.1 Clean inspection X W (W) (S) QCF- P03
2.2 General inspection X W (W) (S) QCF- G01
II SUPERHEATER

1 Clean inspection
Drawing X W (W) (S) QCF- P03
2 Liquid penetrant Drawing X W (w) (R) QCF- T03
3 Fit-up inspection Drawing X W (W) (S) QCF-P01
4 Visual inspection Drawing X W (W) (S) QCF-P02
5 Radiographic X R (R) (R) QCF-T09
6 Post weld heat treatment ( PWHT), report and chart X R (R) (R) QCF-P07
7 Hardess test after PWHT X R (R) (R) QCF-P06
8 Positive material alloy indentificate (PMI) X R (R) (R) QCF-P22
III HEATER
1 Clean Drawing X W (W) (S) QCF-P03
2 Liquid penetrant
Drawing X W (w) (R) QCF-T03
IV OIL FIRING SYSTEM
1 Oil heater
1.1 Clean inspection Drawing X W (W) (S) QCF-P03
2 Oil Pump
2.1 Clean inspection Drawing X W (W) (S) QCF-P03
3 Burner
3.1 Clean inspection Drawing X W (W) (S) QCF-P03
V BUCKSTAY
1 Clean inspection Drawing X W (W) (S) QCF-P03
2 Visual inspection Drawing X W (W) (S) QCF-P02
VI ACCEPTANCE EQUIPMENT AFTER INSPECTION Drawing X W (W) (S) QCF-A01


5. ATTACHMENT.
. Attachment 1: QCF – P03
. Attachment 2: QCF – T01
. Attachment 3: QCF – T03
. Attachment 4: QCF – I01
. Attachment 5: QCF – M05
. Attachment 6: QCF – G01
. Attachment 7: QCF – P01
. Attachment 8 QCF – P02
. Attachment 9: QCF – T09
. Attachment 10: QCF – P07
. Attachment 11: QCF – P06
. Attachment 12: QCF – P22
. Attachment 13: QCF – A01

0/5000
Từ: -
Sang: -
Kết quả (Anh) 1: [Sao chép]
Sao chép!
ITP FOR FINAL INSPECTION BOILER PROJECT : HAI PHONG II THERMAL POWER PLAN LOCATION : HAI PHONG, VIETNAM OWNER : HAI PHONG THERMAL POWER JOINT STOCK COMPANY 00 Issued for Approval REV. DATE STATUS WRITTEN BY CHECKED BY APPROVED BYDOCUMENT REVISIONS Document Class: ZREVISION LOGREV. NO. REV. DATE REVISED PAGE REVISION DESCRIPTION00 ISSUED FOR APPROVAL CONTENT1. GENERAL.................................................................... PAGE 4. 2. PROCEDURE ................................................................PAGE 4. 3. REFERENCE................................................................... PAGE4. 4. INSPECTION NOTIFICATION............................................PAGE4. 5. ATTACHMENT................................................................ PAGE5. 1. GENERALThis Inspection and Test Plan for pipe is a typical plan for final inspection during the construction activities of Hai Phong - Viet Nam Project.2. PROCEDUREIncase of any conflict between Subcontractor and Contractor procedures indicated in the ITP, the Contractor procedures shall be strictly adhere.3. REFERENCES.The relevant documents are proposed for the repair final of machinery and equipment.4. INSPECTION NOTIFICATION. 4.1 The inspection notification shall be made in the daily communication between the Contractor and Subcontractor as per Inspection and Test Plan.4.2 The interface points to be included in this ITP as follows :X = Means inspection or test execution, and issue of document or inspection report consists of controlling with measurement, test or visual checks that the specified requirements are sufficient met.W = Means not mandatory witnessing of inspection or work on an as-wished basis further to a mandatory notification.S = Means surveillance of Work of Inspection as per routine supervision.H = Means Hold Point i.e mandatory witness of inspection or work or mandatory document approval further to a mandatory notification.R = Means review of documents, reports or mill certificates and to checking the validity and acceptability of submitted documentation. ( ) = Mean spot - (W) "Spot Witness" - (R) " Spot Review" ITEM No. Description of QC Activity Reference Document Inspection Level QC Inspection Format Remark Sub-contractor Contractor Owner C/A I DRUM 1 OUTSIDE 1.1 Clean inspection X W (W) (S) QCF- P03 1.2 Visual inspection Drawing X W (W) (S) QCF- T01 1.3 Liquid Penetrant Drawing X W (w) (R) QCF- T03 1.4 Pressure gause inspection X W (W) (S) QCF- I01 1.5 Steam drum inner checking Drawing X W (w) (R) QCF- M05 2 INSIDE 2.1 Clean inspection X W (W) (S) QCF- P03 2.2 General inspection X W (W) (S) QCF- G01 II SUPERHEATER 1 Clean inspection Drawing X W (W) (S) QCF- P03 2 Liquid penetrant Drawing X W (w) (R) QCF- T03 3 Fit-up inspection Drawing X W (W) (S) QCF-P01 4 Visual inspection Drawing X W (W) (S) QCF-P02 5 Radiographic X R (R) (R) QCF-T09 6 Post weld heat treatment ( PWHT), report and chart X R (R) (R) QCF-P07 7 Hardess test after PWHT X R (R) (R) QCF-P06 8 Positive material alloy indentificate (PMI) X R (R) (R) QCF-P22 III HEATER 1 Clean Drawing X W (W) (S) QCF-P03 2 Liquid penetrant Drawing X W (w) (R) QCF-T03 IV OIL FIRING SYSTEM 1 Oil heater 1.1 Clean inspection Drawing X W (W) (S) QCF-P03 2 Oil Pump 2.1 Clean inspection Drawing X W (W) (S) QCF-P03 3 Burner 3.1 Clean inspection Drawing X W (W) (S) QCF-P03 V BUCKSTAY 1 Clean inspection Drawing X W (W) (S) QCF-P03 2 Visual inspection Drawing X W (W) (S) QCF-P02 VI ACCEPTANCE EQUIPMENT AFTER INSPECTION Drawing X W (W) (S) QCF-A01 5. ATTACHMENT. . Attachment 1: QCF – P03. Attachment 2: QCF – T01. Attachment 3: QCF – T03. Attachment 4: QCF – I01. Attachment 5: QCF – M05. Attachment 6: QCF – G01. Attachment 7: QCF – P01. Attachment 8 QCF – P02. Attachment 9: QCF – T09. Attachment 10: QCF – P07. Attachment 11: QCF – P06. Attachment 12: QCF – P22. Attachment 13: QCF – A01
đang được dịch, vui lòng đợi..
Kết quả (Anh) 2:[Sao chép]
Sao chép!
ITP BOILER INSPECTION FOR FINAL PROJECT: HAI Phong II THERMAL POWER PLAN LOCATION: HAI Phong, VIETNAM OWNER: THERMAL POWER JOINT STOCK COMPANY HAI Phong 00 Issued for Approval REV. WRITTEN BY STATUS BY DATE APPROVED BY Checked Revisions DOCUMENT Document Class: Z REVISION LOG REV. NO. REV. REVISED DATE REVISION DESCRIPTION PAGE 00 FOR Approval Issued CONTENT 1. GENERAL .................................................................. ..page 4. 2. PROCEDURE ............... .. ........................................... ... .page 4. 3. REFERENCE ...................................................... .. ... .. ... ... Page4. 4. INSPECTION NOTIFICATION ........................................ ... .page4. 5. ATTACHMENT ............................................. ... .......... ...... Page5. 1. GENERAL Inspection and Test Plan for pipe This is a typical plan for final inspection during the construction of Hai Phong activities - Viet Nam Project. 2. PROCEDURE Incase of any conflict between Subcontractor and Contractor procedures Indicated in the ITP, the Contractor shall be Strictly Adhere procedures. 3. REFERENCES. The relevant documents are proposed for the repair of machinery and equipment final. 4. INSPECTION NOTIFICATION. 4.1 The inspection notification shall be made ​​in the daily communication between the Contractor and Subcontractor as per Inspection and Test Plan. 4.2 The interface points to be included in this ITP as follows: X = Means inspection or test execution, and issue of inspection report or document consists of Controlling with measurement, test or visual checks that met the specified requirements are sufficient. W = Means of inspection or work on an as-not Witnessing Mandatory Wished further to a Mandatory notification basis. S = Means surveillance of Work of Inspection as per routine supervision. H = Means Hold Point ie Mandatory Mandatory witness of inspection or work or further approval to a Mandatory notification document. R = Means review of documents, reports or checking the validity and acceptability of submitted mill certificates and to documentation . () = Mean spot - (W) "Spot Witness" - (R) "Spot Review" ITEM No. Description of QC Activity Level QC Inspection Inspection Reference Document Format Remark Sub-contractor Contractor Owner C / A I DRUM 1 Outside Clean inspection XW 1.1 (W) (S) Qcf- P03 Drawing 1.2 Visual inspection XW (W) (S) Qcf- T01 1.3 Liquid Penetrant Drawing XW (w) (R) T03 Qcf- 1.4 Pressure gause inspection XW (W) (S) Qcf- I01 1.5 Steam inner drum checking Drawing XW (w) (R) M05 Qcf- 2 INSIDE 2.1 Clean inspection XW (W) (S) Qcf- P03 2.2 General inspection XW (W) (S) Qcf- G01 II Superheater 1 Clean inspection Drawing XW (W) (S) Qcf- P03 2 Liquid Penetrant Drawing XW (w) (R) Qcf- T03 3 Fit-up inspection Drawing XW (W) (S) QCF-P01 4 Visual inspection Drawing XW (W) (S) QCF-P02 5 Radiographic XR (R) (R) QCF-T09 6 Post weld heat treatment (PWHT), report and chart XR (R) (R) QCF-P07 7 Hardess test after PWHT XR (R) (R) QCF-P06 8 Positive alloy material Indentificate (PMI) XR (R) (R) QCF-P22 III HEATER 1 Clean Drawing XW (W) (S) QCF-P03 2 Liquid Penetrant Drawing XW (w) (R) QCF-T03 IV Firing OIL SYSTEM 1 Oil heater 1.1 Clean inspection Drawing XW (W) (S) QCF-P03 2 Oil Pump 2.1 Clean inspection Drawing XW (W) (S) QCF-P03 3 Burner 3.1 Clean inspection Drawing XW (W) (S) QCF-P03 V Buckstay 1 Clean inspection Drawing XW (W) (S) QCF-P03 2 Visual inspection Drawing XW (W) (S) QCF-P02 VI ACCEPTANCE AFTER INSPECTION EQUIPMENT Drawing XW (W) (S) QCF-A01 5. ATTACHMENT. . Attachment 1: QCF - P03 . Attachment 2: QCF - T01 . Attachment 3: QCF - T03 . Attachment 4: QCF - I01 . Attachment 5: QCF - M05 . Attachment 6: QCF - G01 . Attachment 7: QCF - P01 . Attachment 8 QCF - P02 . Attachment 9: QCF - T09 . Attachment 10: QCF - P07 . Attachment 11: QCF - P06 . Attachment 12: QCF - P22 . Attachment 13: QCF - A01





















































































































































































đang được dịch, vui lòng đợi..
Kết quả (Anh) 3:[Sao chép]
Sao chép!
ITP for final inspection boiler Closed Closed project: health expenditure by cost types PHONG II. THERMAL Green Power that lasts longer by was critical location: PHONG health expenditure by cost types, Vietnam was critical owner: health expenditure by cost types phong thermal Green Power that lasts longer Shows all Joint Stock Company Closed Closed was critical was critical was critical
1.50 issued for approval
Rev Limit Exceeded. DATE security written by checked by approved by
document revisions Closed Closed Closed was critical Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Document' letters: Z Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed
revision log closed
Rev Limit Exceeded. NO. Rev Limit Exceeded. DATE revised revision on closed descriptionWeb site issued for approval for him was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical was critical Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed As competitive athletes they

1. This letter Prince.................................. . In 4. Was critical 2. PROCEDURE......... . ...................... .... In 4. Was critical 3. REFERENCE............................ . .... . .... . . In4. Was critical 4. INSPECTION notification..................... .... In4. Was critical 5.ATTACHMENT........................ . . ...... ...... an5. Was critical was critical Closed Closed was critical
1. This letter Prince
inspection system and by the happenings for pipe with a typical by for final inspection during the construction activities of health expenditure by cost types phong - Viet Nam project.
2.
procedure incase of war between those that replayed subcontractor and contractor procedures indicated in the itp, the contractor procedures has been reached shall adhere strictly.
3. REFERENCES. Bill was worn outThe relevant documents what does proposed for the final repair of machinery and equipment.
4. INSPECTION notification.
4. 1 The inspection notification shall made great curiosity in the suiting communication between the contractor and subcontractor was haunches inspection and happenings by.
4. 2 The data structure to Grandpa Merriwether included great curiosity in itp system as follows:
X = inspection means a execution happenings,And issue of document inspection a statement consists of controlling with measurement happenings, a visual checks couple of the specified requirements what does sufficient synchronization modes MET.
W = means not mandatory witnessing inspection of a commitment on an was-wished further basis to a mandatory notification.
that = means surveillance of the commitment of the inspection was routine haunches supervision.
H = means hold-mail.E mandatory witness inspection of a commitment to a mandatory document approval further to a mandatory notification.
R = means review of documents, but faced with clear documentation showing a mill certificates and to checking the validity and acceptability of submitted documentation. Was critical ( ) = mean spot - (W) "Spot" witness for him - (R) "Spot" review was critical Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed
item no.Description of qc activity Reference document inspection level qc inspection Image File Format: remark for him internet sites should not contractor contractor owner c/A,
expertise instrument
1 outside
1. 1 clean up inspection X W (W) (S)- QCF P03
1. 2 Visual inspection drawing X W (W) (S) QCF- t has quenched his fires
1. 3 liquid penetrant drawing X W (w) (R) QCF- T03
1. 4 pressure gause inspection X W (W) (S) QCF, has quenched his fires
1.
đang được dịch, vui lòng đợi..
 
Các ngôn ngữ khác
Hỗ trợ công cụ dịch thuật: Albania, Amharic, Anh, Armenia, Azerbaijan, Ba Lan, Ba Tư, Bantu, Basque, Belarus, Bengal, Bosnia, Bulgaria, Bồ Đào Nha, Catalan, Cebuano, Chichewa, Corsi, Creole (Haiti), Croatia, Do Thái, Estonia, Filipino, Frisia, Gael Scotland, Galicia, George, Gujarat, Hausa, Hawaii, Hindi, Hmong, Hungary, Hy Lạp, Hà Lan, Hà Lan (Nam Phi), Hàn, Iceland, Igbo, Ireland, Java, Kannada, Kazakh, Khmer, Kinyarwanda, Klingon, Kurd, Kyrgyz, Latinh, Latvia, Litva, Luxembourg, Lào, Macedonia, Malagasy, Malayalam, Malta, Maori, Marathi, Myanmar, Mã Lai, Mông Cổ, Na Uy, Nepal, Nga, Nhật, Odia (Oriya), Pashto, Pháp, Phát hiện ngôn ngữ, Phần Lan, Punjab, Quốc tế ngữ, Rumani, Samoa, Serbia, Sesotho, Shona, Sindhi, Sinhala, Slovak, Slovenia, Somali, Sunda, Swahili, Séc, Tajik, Tamil, Tatar, Telugu, Thái, Thổ Nhĩ Kỳ, Thụy Điển, Tiếng Indonesia, Tiếng Ý, Trung, Trung (Phồn thể), Turkmen, Tây Ban Nha, Ukraina, Urdu, Uyghur, Uzbek, Việt, Xứ Wales, Yiddish, Yoruba, Zulu, Đan Mạch, Đức, Ả Rập, dịch ngôn ngữ.

Copyright ©2025 I Love Translation. All reserved.

E-mail: